Project Case Study

Building Sustainable Infrastructure with LithiumCure 1000

SALT LAKE CITY, UT – Valued at over $600 million, the New Water Reclamation Facility (WRF) is one of the largest public works projects ever undertaken by Salt Lake City. Scheduled for completion in 2026, the state-of-the-art facility will replace the city’s only wastewater treatment plant, a 55-year-old system that currently processes 33 million gallons of wastewater per day. Once complete, the new facility will serve more than 200,000 residents and businesses across a 110-square-mile service area with reliable, sustainable treatment capacity of 56

750,000 Square Feet – Time, Labor, and Water Savings with LithiumCure 2000

PEACHTREE CORNERS, GA – Located at 5655 Spalding Drive, the Intuitive Surgical Georgia Campus Expansion is set to become a regional headquarters for one of the world’s leaders in minimally invasive surgical care. The six-building campus, totaling more than 750,000 square feet, will house advanced manufacturing and engineering operations, state-of-the-art training facilities for surgeons and hospital care teams, and administrative offices. With such a complex and large-scale project, the quality of the concrete slabs would play a critical role in the performance and longevity

SINAK VC-5 Puts 35 Days Back into The Project Schedule

DES PLAINES, IL – In the heart of Cook County, Des Plaines stands as a family-oriented town filled with historic city homes and attractions such as the Koehnline Museum of Art, Lake Opeka, and Mystic Waters Family Aquatic Center. With the combined effort of Gewalt Hamilton Associates, Boldt Construction, and SINAK, the Aurora Healthcare facility was delivered weeks ahead of schedule and under budget with an estimated labor cost savings of more than $100,000. SINAK VC-5 contributed by cutting more than 35 days off

100,000 Square Feet – ZERO Flooring Failures with SINAK VC-5

SPARKS, NV – The high desert region of Northern Nevada is notorious for climate extremes. The low humidity, unpredictable winds, and broad temperature range has resulted in difficult concrete placements for decades. Current curing methods produce poor slab quality and performance, resulting in costly concrete defects such as cracking, crazing and slab curl. These avoidable defects have become the norm and are expected and accepted results. Furthermore, all quality and performance defects must be repaired prior to flooring installation, slowing project schedule, and increasing

235,641 Square Feet – ZERO Flooring Failures with SINAK VC-5

SANTA ANA, CA – In the heart of Orange County, Santa Ana stands as a family-oriented town filled with historic city homes, and attractions such as the Santa Ana Zoo, Bowers Museum full of incredible Native American art, and the Discovery Cube Orange County, an interactive children’s museum. With the combined effort of LPA Architects, Swinerton Builders, and Griffin Structures this project was delivered five months ahead of schedule resulting in a savings of $5 million to the County. SINAK VC-5 contributed to this

52,000 Square Feet – ZERO Flooring Failures with SINAK VC-5

RENO, NV - Nick Poulakidas was a Native Nevadan who worked for the Washoe County School district for more than 30 years. He was a teacher at Robert Mitchell Elementary School, Veterans Memorial School, and Sparks Intermediate School. He was also the principal of Mary Lee Nichols Elementary School and Lincoln Park Elementary School for 24 years. Mr. Poulakidas died in 1981, after suffering a heart attack at a dance at the Nevada PTA Convention in Ely. It was only natural that someone who